DoorHan SHAFT-120 설치 및 운영 매뉴얼 - 페이지 7
{카테고리_이름} DoorHan SHAFT-120에 대한 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. DoorHan SHAFT-120 12 페이지.
DoorHan SHAFT-120에 대해서도 마찬가지입니다: 설치 및 운영 매뉴얼 (12 페이지)
5. 3-position control station or key-switch
(N.O. contact) (terminal block X1 and X2)
Connect 3-position control station to terminals
'OPEN', 'STOP', 'CLOSE' and 'GND'.
Important! If 3-position control station is not
used, install the jumper 'STOP' and 'GND'.
Key�switch
3�button control station
9. Programming of operator
9.1 Selection of operation logic
The logic is selected with jumpers on the control unit:
To set the required logic, set the jumpers according to the table:
Opening – Pulse
Closing- Pulse
Automatic closing is off
Opening – Pulse
Closing – Key hold-down
Automatic closing is off
(Remove the jumper JP1)
10. Adjustment of open and close positions.
10.1 Close position (red cam)
Coarse adjustment
•
Make sure, that the operator is fixed rigidly; put the gate in completely closed position.
•
Loosen the screws for coarse adjustment of red cams, then turn them so, that the micro-switches are pushed, then tighten the screws.
•
Open and close the gate, make sure, that the red cams push the micro-switch, and indicator DL3 on the control unit is dim.
Voltage: 220V
Jumper
8.1 Control unit connection
220V Jumper for selection
of supply voltage
380V Jumper for selection
of supply voltage
Transformer
External radio
receiver
Voltage: 380V
Jumper
OP ERATOR SH A F T -1 20 INSTAL LAT IO N AND OP E RAT ING MANU AL
Motor
Fuse
Supply voltage
3x380V 50 Hz
Jumpers
Closing
Opening
Stop button
button
button
Key�switch
3�position control station
Opening – Key hold-down
Closing – Key hold-down
Automatic closing is off
(Remove the jumper JP2)
Opening – Pulse
Closing – Pulse
Automatic closing is on
(delay 30 sec)
WIRING
Important! If there are no
End switches
safety devices, install the
jumper IR�GND
Photocells
Close
Open
Common
7