Astralpool NARBONNE 설치 및 유지 관리 매뉴얼 - 페이지 16

{카테고리_이름} Astralpool NARBONNE에 대한 설치 및 유지 관리 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Astralpool NARBONNE 19 페이지. Above-ground automatic pool cover

Astralpool NARBONNE 설치 및 유지 관리 매뉴얼
Inox Bracket for model under construction + screws:
1) When positioning the safety brackets,
The shaft of the brackets must be put at
500 mm from the edge of the pool.
Inox Brackets for renovation model + screws:
1) Cut the coping stone with a angle grinder
1
2) Put the pin M8 in the Ø10 wholes.
Screw until complete closing of the brackets.
Put the return safety strap in the brackets.
3
3) Clip both sides together.
2) Make two Ø10 wholes. Place the M8 pin in the wholes. Screw until
complete closing of the safety brackets.
Put the straps through as per drawings 2 and 3.
3) Replace the coping stone cut with an adequate product.
15/17
Revision number B-007-2012-10-05
ENGLISH
2