DoorKing 115 VAC 6300 매뉴얼 - 페이지 5
{카테고리_이름} DoorKing 115 VAC 6300에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. DoorKing 115 VAC 6300 5 페이지. High voltage kit
1600 Series
Installation for a 115 VAC 1600 series (1601, 1602, 1603) operators ONLY.
Mount step-down transformer.
Step 1:
•
Remove the 1 screw, unbolt the ground wire from the chassis ground and CAREFULLY remove circuit board.
•
Bolt transformer to existing threaded studs on back of supplied plate using the (4) four nuts supplied with this kit.
•
CAREFULLY install the plate and re-install circuit board.
Wire the step-down transformer for the desired input voltage chosen (see first page).
Step 2:
Important Notes:
Dual Gate Operators Installation:
"Optional" Heater Installation:
instruction sheet with the heater kit for AC input power wire run limitations.
Power
Terminal
2600-267-G-6-16
When installing on bi-parting gates, a step-down transformer and AC input power wire is required for EACH operator.
When installing a heater, refer to the "high voltage AC power wire size and distance limitations" table on the
e r
o r m
n s f
T r a
E
T IM
L A Y
D E
U P
O P
L O
t e
R
W E
P O
P l a
)
l i e d
p p
( S u
E
R S
IT Y
V E
R E
IT IV
N S
S E
N O
N C
W N
D O
O P
L O
d
o a r
t B
c u i
C i r
d
u n
G r o
r e
W i
Variable Input Power
(see first page)
Double check your chosen input voltage plug BEFORE
applying power to the step-down transformer. Failure to
choose the CORRECT input voltage plug for your desired
input voltage WILL damage operator and VOID warranty.
Operator MUST be
properly grounded.
Chassis Ground
115 VAC
Power Terminal
Neu
Hot
Keep wires away
from moving parts.
White
Black
115 VAC Output
DANGER
HIGH VOLTAGE!