DoorKing 1601 Series 매뉴얼 - 페이지 2

{카테고리_이름} DoorKing 1601 Series에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. DoorKing 1601 Series 5 페이지. Break-away octagon arm installation kit
DoorKing 1601 Series에 대해서도 마찬가지입니다: 소유자 매뉴얼 (8 페이지), 설치 매뉴얼 (11 페이지)

DoorKing 1601 Series 매뉴얼
Model 6500
Installation for a 115 VAC 6500 primary operator ONLY.
Step 1:
Bolt step-down transformer in position shown depending on the model you have using
the nuts and bolts supplied with this kit.
Step 2:
Wire the step-down transformer for the desired input voltage (see first page).
Important Notes:
Dual Gate Operators Installation:
bi-parting gates, a step-down transformer and AC input
power wire is only required for the PRIMARY gate
operator. Reduce the AC input power wire run max
distance by ONE-HALF.
"Optional" Heater Installation:
refer to the "high voltage AC power wire size and
distance limitations" table on the instruction sheet with
the heater kit for AC input power wire run limitations.
Keep wires away
from moving parts.
Variable Input Power
(see first page)
DANGER
HIGH VOLTAGE!
Double check your chosen input voltage plug BEFORE
applying power to the step-down transformer. Failure to
choose the CORRECT input voltage plug for your desired
input voltage WILL damage operator and VOID warranty.
2600-267-G-6-16
When installing on
Convenience Open
When installing a heater,
Operator
115 VAC
MUST be
Power Terminal
properly
grounded.
Neu
Hot
White
Black
115 VAC Output
Green
Primary 6500
Convenience Open
Primary 6500
WITHOUT
O p
e r a
w i t
b o x
m o
u n t
R e
E l e
c t r
o n
i c
B o
x
WITH
t o r
i l l u
h o u
s t r
t e l
a t e
t o
e c t
d
b e t
r o n
t r a
t e r
i c
n s f
s h o
o r m
w
i n g
e r
p o s
i t i o
n .
Use 3 existing
holes to mount
step-down
transformer.
x
B o
s e t
t
c k e
B r a
Step-Down
Transformer
Mounting
Position