Astralpool RAMSES 사용 설명서 - 페이지 3
{카테고리_이름} Astralpool RAMSES에 대한 사용 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. Astralpool RAMSES 7 페이지. In- ground housing unit
3.4. Do the excavation to prepare for laying the intake and output tubes to the
pool and the electrical supply.
The intake and output tubes must rest on a bed of sand.
It is recommended that you make a drain in the back of the unit using the
knock-out to make the hole. This should be connected to the general tank with a
slight slope.
3.5.- Perforate the unit on the side where the electrical supply is to enter, with a
diameter that matches the cable to be installed. Determine the section of the
cable depending on power consumption and drops in voltage.
Install a cable gland of the appropriate size for the cable section at the entry.
4. INSTALLATION OF THE LEGS IN THE CONCRETE
4.1. - This makes for more accurate levelling. The unit should be put in place
when the concrete floor begins to set and levelled by the upper part. The legs
should be drilled to insert rods so the unit is fully anchored to the concrete,
without the possibility of moving when pressure is applied to the sides.
IMPORTANT:
The installation must include a highly sensitive 2 pole differential on the general
panel (conforming to RBT ITC-BT-017). The differential is not supplied with the
spa.
To avoid flooding, fill with dirt, forming a slight incline.
5
6