AMES Maxim M200 Series 설치, 서비스, 수리 키트, 유지보수 - 페이지 3

{카테고리_이름} AMES Maxim M200 Series에 대한 설치, 서비스, 수리 키트, 유지보수을 온라인으로 검색하거나 PDF를 다운로드하세요. AMES Maxim M200 Series 4 페이지. Double check valve/detector assemblies, sizes 2 1/2"-10" 65-250 mm

Maintenance Instructions 6" – 10" (150 – 250mm)
Material/Tool Requirements:
• #3 Phillips screwdriver or
to span diameter of check, see Figures A and B.
1
/
– 13 x 5" fully threaded hex bolt (Service bolt).
2
3
/
" open end or socket wrench.
4
Instructions:
Prior to servicing any Ames valve, it is manda-
tory to shut down the water system by closing
both the inlet and outlet shutoff valves. After
shutoff valves are closed, open test cock #2,
#3 & #4 to relieve pressure within
the backflow assembly.
1. After #3 test cock has been opened to
relieve pressure, remove #3 test cock from
housing.
When repairing a 6," 8" or 10" (150, 200, 250mm) assembly,
remove both Victaulic couplers from body. Slide the down-
stream Victaulic coupler gasket to the downstream side of the
housing. The upstream Victaulic coupler gasket stays in place.
Testing — Double Check Valve Assemblies
Test Check Valve No. 1
Step 1: Ensure shutoff #1 is open, shutoff #2 is closed.
Step 2: Connect high side hose to test cock #3, low side to test
cock #2 and open both test cock #2 and test cock #3.
Step 3: Open valve C, then open A to bleed air from the high
side. Close valve A, then open B to bleed low side.
Close valve B.
Step 4: Connect vent hose loosely to test cock# 1. Open valve
A to vent air from vent hose, Tighten vent hose at test
cock #1, open test cock #1.
Step 5: Close shutoff #1. Slowly loosen hose at test cock #2
until differential gauge rises to 2 pre-tighten hose. If the
differential reading does not decrease, record check
valves as "tight".
Test Check Valve No. 2
Step 1: Move the high side hose to test cock #4, low side to test
cock #3 and open both test cock #3 and test cock #4.
Remove vent hose from test cock #1, open shutoff #1.
Step 2: Open valve C, then open valve A to bleed air from the
high side. Close valve A, then open valve B to bleed low
side. Close valve B.
Step 3: Connect vent hose loosely to test cock #1. Open valve
A to vent air from the vent hose, Tighten vent hose at
test cock #1, open test cock #1.
Step 4: Close shutoff #1, and then slowly loosen hose at test
cock #3 until differential gauge rises to 2psi and retight-
en hose. If the differential reading does not decrease,
record check as tight. Remove all hoses and restore
valve to original working condition.
Note: The assembly will fail both the first and second check valve
tests above, if shutoff #2 leaks excessively. To test for a leaky #2
shutoff, use the following procedure.
5
/
" diameter rod, length sufficient
16
Figure A
Service Hole
Figure B
2. Remove check/s for maintenance.
3. Locate the service hole and thread in the service bolt by hand
until it contacts the linkage. (Figure A)
4. Continue to thread in service bolt with the wrench until the
service hole in the linkage is aligned with the service notches
on the spring arbors. (Figure A)
5. Insert the Phillips screwdriver through the arbors and service hole
of the linkage making sure that the tip of the screwdriver extends
past the ends of the arbors by a minimum of
6. Back out the service bolt until load is transferred to the screw-
driver. Continue to back out the service bolt until sufficient clear-
ance is achieved to remove the complete spring mechanism.
7. To disconnect linkage, remove retaining clip and pin (store in
a safe location for reinstallation).
8. To remove spring mechanism, grasp the screwdriver at the center
and pull complete assembly straight out and store in a safe place.
9. Reinstall in reverse.
WARNING – While the spring mechanism is removed for check
servicing; never pull the screwdriver out or off the support notches
on the arbors. Doing so may cause bodily injuries.
Test for Leaky No. 2 shutoff
Step 1: Connect the high side to test cock #1, low side to test
cock #4. Open test cock #1 and test cock #4. Close
shutoffs #1 and #2.
Step 2: Close valve C. Open valve A, then open valve B 1.2 turn,
loosen hose at test cock #4 to remove air. Retighten hose.
Step 3: If the differential gauge rises above 0, there is excessive
leakage at shutoff #2 and it must be replaced to test
the assembly.
Ball Type Test Valves
A
High Hose
(Yellow)
Test Cock
Test Cock
No. 1
No. 2
3
1
/
" (6mm). (Figure B)
4
C
B
Needle
Valve
Vent Hose
(Blue)
Low Hose
(White or Red)
Test Cock
Test Cock
No.3
No.4