Dorel DA6940BL 조립 지침 매뉴얼 - 페이지 15
{카테고리_이름} Dorel DA6940BL에 대한 조립 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dorel DA6940BL 20 페이지. Twin/full bunk bed
TWIN/FULL BUNK BED
DA6940E (ESPRESSO) / DA6940W (WHITE)/ DA6940BL(BLUE)
STEP 8
Attach the other guardrail leg (Q) to long guardrails (L) and top side rail (I) with flat head wood
screws (6).
Secure the guardrail leg (Q) (done in step 6) to top side rail (H) with flat head wood screw (6) as
shown.
Place four wood dowels (5) into the holes in the bottom headboard top crosses (T). With the help of
another person, stack the top bunk onto the bottom bunk.