Dormakaba 8900 PT 설치 지침 매뉴얼 - 페이지 3

{카테고리_이름} Dormakaba 8900 PT에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dormakaba 8900 PT 10 페이지. Emf surface applied closer (no detector)
Dormakaba 8900 PT에 대해서도 마찬가지입니다: 설치 지침 매뉴얼 (8 페이지)

Dormakaba 8900 PT 설치 지침 매뉴얼
dormakaba 8900 EMF Installation Instructions
1  Technical specifications

1.1 Preparation notes

1.
Each (HO) hold open unit contains a door closer
and track assembly with hold open
electromagnet. The unit can be connected
directly to a fire control panel.
2.
Read entire instruction sheet prior to installation
and refer to NFPA 72E. Standards may be
obtained from THE NATIONAL PROTECTION
ASSOCIATION, Batterymarch Park, Quincy, MA
02269.
8900 EMF
3.
4.
08281000
Reference unit carton for unit mounting style and
voltage.
Prepare door and frame for fasteners using the
appropriate template. Mark, drill, and tap holes
as indicated. If surface wiring is used, omit 7/8"
hole for wire access.

Technical specifications

03-2020
3