Canyon 98-161 조립 지침 매뉴얼 - 페이지 2
{카테고리_이름} Canyon 98-161에 대한 조립 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Canyon 98-161 14 페이지. Cottage colors collection bunk bed

LIST OF CONTENTS
COTTAGE COLORS COLLECTION
STEP BUNK BED UNIT BOX ( 98-161 ) FIG.1
A.- (1) STEP UNIT
BUNK BED END BOX ( 98-706 ) FIG.2
B.- (1) HEADBOARD
C.- (1) FOOTBOARD
D.- (1) HAND RAIL
E.- (1) BACK FRAME
HARDWARE PACK
F.- (2) 100MM BOLTS
G.- (4) 35MM BOLTS
H.- (6) CAP NUTS
I.- (1) 4MM ALLEN WRENCH
J.- (1) 5MM ALLEN WRENCH
K.- (4) 1 1/2" PAN HEAD SCREWS
L.- (4) SIDE RAILS
M.-(2) GUARD RAILS
HARDWARE PACK
N.- (24) 80MM FLAT HEAD BOLTS
O.- (24) 5/8" CROSS DOWEL NUTS
J.- (1) 5MM ALLEN WRENCH
4 PCS SLAT PACK BOX ( 98-645,98-646 ) FIG.5
P.- (4) SLATS
HARDWARE PACK
Q.- (8) 1 1/4" SCREWS
FULL EXTENTION KIT BOX ( 98-782 ) FIG.6
R.- (2) EXTENTION KITS
HARDWARE PACK
S.- (2) METAL PLATES
T.- (8) 17.4MM CONECTOR BOLTS
G.- (1) 35MM BOLT
H.- (9) CAP NUTS
J.- (1) 5MM HEX KEY
TRUNDLE BED STORAGE BOX ( 98-744 ) FIG.7
U.- (1) TRUNDLE BED
ALL PIECES ARE CONNECTED TOGETHER )
4.- TO ATTACH BOTTOM SIDE RAILS, USE THE SAME PROCESS AS SHOWN IN TOP SIDE RAILS, USING TWO SIDE RAILS TO HDBD&FTBD BOTTOM HOLES, SEE FIG.9
5.- PLACE FOUR SLATS (P) ON TOP & BOTTOM SIDE RAIL CLEATS, ONE SLAT IN BOTH HDBD&FTBD ENDS, PUSH THE SLATS AGAINST THE BED END POST ( FIG.A ) AND TWO SLATS IN THE MIDDLE AT EQUAL DISTANCE
FROM THE END SLATS, THEN EACH SLAT MUST BE FASTEN WITH ONE 1 1/4" SCREW (Q), SEE FIG.10
FIG. 8
REV 01 01/08/16
STEP BUNK BED UNIT ASSEMBLY INSTRUCTIONS CONFIGURATION TYPE # 1
(HPK00026)
(HPK00104)
(HPK00016)
OPTIONAL
(HPK00044)
SEE FIG.9, REPEAT THE SAME PROCEDURE AT ALL FOUR CORNERS.
FIG. 9
CANYON FURNITURE COMPANY.
A
B
FIG. 2
O
P
Q
FIG. 5
TWIN OVER TWIN BUNK BED ASSEMBLY
1.- TO ASEMBLE STEP BUNK BED, USING ONE HEADBOARD (B), ONE FOOTBOARD (C), FOUR SIDE RAILS (L), AND
TWO GUARD RAILS (M).
2.- INSERT TWO CROSS DOWELS (O) IN ACCESS HOLE INSIDE THE SIDE RAIL & GUARD RAIL, ALIGN THE CROSS
DOWEL NUT, MAKE SURE THE GROOVE IS HORIZONTAL, SEE FIG.8
3.- ATTACH TWO SIDE RAILS (L), AND TWO GUARD RAILS (M) ON TOP TO HEADBOARD WITH THE GROVE LINE AS
SHOWN IN FIG.9 AND FOOTBOARD, INSERTING TWO FLAT HEAD BOLTS (N) INTO THE HDBD & FTBD HOLES, USE
5MM ALLEN WRENCH (J) TO TIGHTEN BOTH FLAT HEAD BOLTS,
( USE TWO 4 PCS SLAT PACK (98-645) IN CONFIGURATION #1, OPTION #1
PAGE 2 OF 6
D
FIG. 1
H
E
FIG. 3
L
J
R
T
S
FIG. 6
( USE TWO 4 PCS SLAT PACK 98-645 )
(DO NOT TIGHTEN COMPLETELY UNTIL
FIG. 10
C
F
G
J
I
K
M
FIG. 4
N
U
FIG. 7
OPTION #2 )
AND
FIG. A
KIS01129