Baumer PAC50S 운영 매뉴얼 - 페이지 18

{카테고리_이름} Baumer PAC50S에 대한 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Baumer PAC50S 44 페이지.

Baumer PAC50S 운영 매뉴얼
9
|

Commissioning

9
Commissioning
9.1

Commissioning- preamble

Putting the sensor into operation is only in the form of a component within the piping system.
Therefore, besides the operator's specifications and overall system settings, all safety warnings
and instructions in the present manual must be observed.
The sensor must be installed.
n
Electrical sensor connection must be present.
n
System parameterization must be completed prior to commissioning.
Sensor parameterization is by the following options:
Display
n
FlexProgram
n
IO-Link master
n
Also see about this
2 Mounting the sensor [} 13]
2 Electrical connection [} 16]
2 Parameterization using the integrated display [} 18]
2 Parameterization via FlexProgram [} 22]
2 Parameterization via IO-Link master [} 23]
9.2

Factory settings

Sensor parameters
Output mode
Conductivity Range 1
Conductivity Range 2
Temperature output
Output damping
Temperature compensation Range 1-2
Output lower limit
Output upper limit
9.3

Parameterization using the integrated display

Sensor settings can be entered via the display.
Parameterization options (example)
Define the conductivity range.
n
Define output damping.
n
Define the measuring mode.
n
Parameterization of temperature compensation.
n
Parameterization of switching output.
n
Select the temperature source for compensation.
n
18
Operating Manual
Value
Conductivity
0 ... 200 mS/cm
0 ... 20 mS/cm
0 ... 150 °C
0.0 s
2.0 %/K
3.7 mA
21 mA
PAC50H/S | V1
Baumer