Montage
4.1
Schritt 1
Zul. Anzugsmoment
Max. tightening torque
M
= 23 Nm
t
4.2
Version mit EUROFlansch B10
4.2.1
Schritt 2
* Siehe Seite 7
See page 7
Motorwelle einfetten!
Die Antriebswelle sollte einen mög
lichst kleinen Rundlauffehler aufwei
sen. Rundlauffehler verursachen Vib
rationen, die die Lebensdauer der
Kombination verkürzen können.
MB079.1 - 11115288
*
17
2.5 mm
15
10 mm
Baumer_TDP02-FSL-TDPZ02-FSL_II_DE-EN (15A3)
4
Mounting
4.1
Step 1
4.2
Version with EURO flange - B10
4.2.1
Step 2
*
*
16
Lubricate motor shaft!
The drive shaft should have as less
runout as possible. Any radial devia-
tion can cause vibrations, which can
shorten the lifetime of the combina-
tion.
Montage / Mounting
4