Dover PSG BLACKMER MLXW4B 설치, 작동 및 유지보수 지침 - 페이지 3

{카테고리_이름} Dover PSG BLACKMER MLXW4B에 대한 설치, 작동 및 유지보수 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Dover PSG BLACKMER MLXW4B 20 페이지. Power pumps

Dover PSG BLACKMER MLXW4B 설치, 작동 및 유지보수 지침
NOTICE:
Blackmer pumps must only be installed in systems
designed by qualified engineering personnel.
design must conform with all applicable regulations and
codes and provide warning of all system hazards.
Install, ground and wire to local and
National Electrical Code requirements.
Install an all-leg disconnect switch near
the unit motor.
Disconnect and lockout electrical power
before installation or service
Hazardous voltage.
Electrical supply MUST match motor
Can shock, burn or
cause death.
nameplate specifications.
Motors equipped with thermal protection automatically
disconnect motor electrical circuit when overload exists.
Motor can start unexpectedly and without warning.

PRE-INSTALLATION CLEANING

NOTICE:
New pumps contain residual test fluid and rust inhibitor.
If necessary, flush pump prior to use.
Foreign matter entering the pump WILL cause extensive
damage. The supply tank and intake piping MUST be
cleaned and flushed prior to pump installation and operation.

LOCATION AND PIPING

Pump life and performance can be significantly reduced when
installed in an improperly designed system. Before starting
the layout and installation of the piping system, review the
following suggestions:
1.
Locate the pump as near as possible to the source of supply
to avoid excessive inlet pipe friction.
2.
The inlet line must be at least as large as the intake port on
the pump. It should slope downward to the pump and must
not contain any upward loops. Eliminate restrictions such as
sharp bends; globe valves, unnecessary elbows, and
undersized strainers.
3.
Install a strainer in the inlet line to protect the pump from
foreign matter. Locate the strainer at least 24" (0.6m) from
the pump, and have a net open area of at least four times
the area of the intake piping. Strainers must be cleaned
regularly to avoid pump starvation.
4.
The intake system must be free of air leaks.
5.
Expansion joints, placed at least 36" (0.9m) from the pump,
will compensate for expansion and contraction of the pipes.
Contact the flexible connector/hose manufacturer for
required maintenance/care and design assistance in their
use.
Install pressure gauges in the NPT ports provided in the
6.
pump casing to check pump at start up.
7.
ALL piping and fittings MUST be properly supported to
prevent any piping loads from being placed on the pump.

INSTALLATION

8.
Check alignment of pipes to pump to avoid strains which
might later cause misalignment. See Figure 1. Unbolt
System
flanges or break union joints. Pipes must not spring
away or drop down. After pump has been in operation
for a week or two, completely recheck alignment.
9.
When pumping liquids at elevated temperature, make
provisions to compensate for expansion and contraction
of the pipes, especially when long pipe lines are
necessary. Steel pipe expands approximately 3/4" (1.9
cm) per 100 feet (30.49 m) per 100°F (37.8°C) rise in
temperature.

PUMP MOUNTING

A solid foundation reduces noise and vibration, and will
improve pump performance. On permanent installations it is
recommended the pumping unit be secured by anchor bolts
as shown in Figure 2. This arrangement allows for slight
shifting of position to accommodate alignment with the
mounting holes in the base plate.
For new foundations, it is suggested that the anchor bolts be
set in concrete. On existing concrete floors, drill holes into
the concrete to hold the anchor bolts.
When installing units built on channel or structural steel type
bases, use care to avoid twisting the base out of shape when
anchor bolts are tightened. Use shims under the edges of the
base prior to tightening of the anchor bolts to level the base
and prevent distortion.
106-A00
page 3/20
Figure 1
Figure 2 - Pipe Type Anchor Bolt Box