Follett HCC1000ABS 설치 지침 매뉴얼 - 페이지 8
{카테고리_이름} Follett HCC1000ABS에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Follett HCC1000ABS 16 페이지. For ice storage bins. ice machine models with ride technology
Install the ice transport tube.
5.1
Ice transport tube installation
Ice transport tube tips
• Insulate entire length of ice transport tube
• Secure ice transport tube
runs see guide on page 14.
• Pitch ice transport tube at least 1/4" per foot (6,4mm/.3m)
• Ice transport tube must drain towards ice machine
Ice transport tube to bin
• Be sure tube ends are square
• Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers
before making connection to ease assembly
• Push ice transport tube onto ice machine nipple
• Install hose clamp
Ice transport tube to Ice machine
• Be sure tube ends are square
• Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers
before making connection to ease assembly
• Push ice transport tube onto ice machine nipple
• Install hose clamp
8
1/4˝ (6,4mm)
➋
as needed to prevent dips and traps from forming. For long tube
➍
➐
➑
➓
self-contained
Hot Water
160 F (71 C)
1' (0,3m)
➊
➌
➏
➒
Ice transport tube
BIN • RIDE Technology
5
➎
➎