Follett HCC1410ABS 설치 지침 매뉴얼 - 페이지 8
{카테고리_이름} Follett HCC1410ABS에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Follett HCC1410ABS 17 페이지. Self-contained chewblet ice machine
Follett HCC1410ABS에 대해서도 마찬가지입니다: 매뉴얼 (8 페이지), 빠른 시작 매뉴얼 (8 페이지)
Install the ice transport tube.
5.1
Ice transport tube installation
➏
➐
Ice transport tube tips
• Insulate entire length of ice transport tube
• Secure ice transport tube
runs see guide on page 14.
• Pitch ice transport tube at least 1/4" per foot (6,4mm/.3m)
• Ice transport tube must drain towards ice machine
Ice transport tube to bin
• Be sure tube ends are square
• Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers
before making connection to ease assembly
• Push ice transport tube onto ice machine nipple
• Install hose clamp
Ice transport tube to Ice machine
• Be sure tube ends are square
• Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers
before making connection to ease assembly
• Push ice transport tube onto ice machine nipple
• Install hose clamp
8
➍
➋
1/4˝ (6,4mm)
➋
as needed to prevent dips and traps from forming. For long tube
➍
➐
➑
➓
Hot Water
160 F (71 C)
➊
➌
1' (0,3m)
➊
➌
➏
➒
self-contained
Ice transport tube
➎
➑
➒
➓
BIN • RIDE Technology
5
➎
➎