Follett HCF1000R 설치 지침 매뉴얼 - 페이지 3
{카테고리_이름} Follett HCF1000R에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Follett HCF1000R 8 페이지.
Carefully unpack and inspect the contents of your condensing unit
To ensure proper performance, ease of service and warranty coverage, it is
critical that you follow the requirements detailed in this manual. If you cannot
meet these requirements or have questions, call our technical service group
at 877.612.5086 for installation support.
2.1
2.1
Condenser Unit Clearances
48"
(1219mm)
Discharge air
• Position condenser unit as shown above, with clearances noted above
REMOTE CONDENSING UNIT
38" (965mm)
(only required for Single-phase units)
B
A
48" (1219mm)
(only required for Single-phase units)
Unpack
Site preparation
48"
(1219mm)
Air flow
Single-phase
3-phase
A
27.0 (68.6 cm)
23.50" (59.7 cm)
B
38.9 (98.8 cm)
35.13" (89.2 cm)
1
2
3