Follett HMD710ABT 설치 지침 매뉴얼 - 페이지 6

{카테고리_이름} Follett HMD710ABT에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Follett HMD710ABT 12 페이지. To ice storage bin top-mount applications

Follett HMD710ABT 설치 지침 매뉴얼
3.

Louvered Docking Assembly Installation

§ Prior to installing the louvered docking assembly, ensure that the drain fitting is oriented (right or left) correctly
for your installation. An optional straight drain fitting is also supplied. You may need to remove the back panel
of the docking assembly in order to re-orient or change the drain fitting. Replace back panel prior to mounting
the docking assembly.
§ Docking station must be secured in accordance with these instructions to ensure ice machine stability.
§ Ventilation openings in the louvered docking station should be clear of obstruction. Failure to do so could
result in damage to equipment.
§ Plug must be accessible after final installation.
§ Remove protective tape from gaskets
§ Mount louvered docking assembly using two screws
provided.
6
WARNING!
.
Horizon 710/1010/1410
—
§ Apply gaskets
.
§ Install shuttle actuator
and secure with locking nut
–
˜
–
through dispenser top
.
BIN • TOP-MOUNT