Follett Horizon Chewblet 710 Series 설치 지침 매뉴얼 - 페이지 11

{카테고리_이름} Follett Horizon Chewblet 710 Series에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Follett Horizon Chewblet 710 Series 17 페이지. Models with ride technology

Follett Horizon Chewblet 710 Series 설치 지침 매뉴얼
Connect utilities to louvered docking assembly.
6.1

Air-cooled ice machines only

2 ft. x 1" OD
silicone tubing
3/4" barb x 3/4" FPT
3/4" MPT x 1" slip
1" Stand pipe/Drain
• Rough-in ice machine potable water
supply
.
3/8" push-in connection will be made at
shut-off valve inside machine
• Remove access panel if necessary
• Connect the silicone tubing to the ice
machine 3/4" drain barb
• Assemble the 3/4" barb x 3/4" FPT to the
3/4" MPT x 1" slip. Connect the other end
of the silicone tubing to the 3/4" barb
• Connect the 1" slip fitting to the 1" stand
.
pipe/drain
Note: Minimum 8" radius on silicone
drain line. Drain line from the ice machine
must have at least 1/4" per foot pitch
(6,4mm/0,3m).
• Apply Petrol-gel to barbed drain fitting
• Replace access panel.
VISION • RIDE Technology
Minimum 8"
radius
.
.
.
self-contained

External connections

6.2

Water-cooled ice machines only

3/4" barb x 3/4" FPT
• Rough-in ice machine potable water
supply
.
3/8" push-in connection will be made at
shut-off valve inside machine
• Remove access panel if necessary
• Connect the silicone tubing to the ice
machine 3/4" drain barb
• Assemble the 3/4" barb x 3/4" FPT to the
3/4" MPT x 1" slip. Connect the other end
of the silicone tubing to the 3/4" barb
• Connect the 1" slip fitting to the 1" stand
pipe/drain
.
Note: Minimum 8" radius on silicone
drain line. Drain line from the ice machine
must have at least 1/4" per foot pitch
(6,4mm/0,3m).
• Connect cooling water supply
return
• Apply Petrol-gel to barbed drain fitting
• Replace access panel.
6
Minimum 8"
radius
2 ft. x 1" OD
silicone tubing
3/4" MPT x 1" slip
1" Stand pipe/Drain
.
.
.
and
11