Follett Horizon Elite HCC1410WVS 설치 지침 매뉴얼 - 페이지 12

{카테고리_이름} Follett Horizon Elite HCC1410WVS에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Follett Horizon Elite HCC1410WVS 17 페이지. Self-contained chewblet ice machine
Follett Horizon Elite HCC1410WVS에 대해서도 마찬가지입니다: 매뉴얼 (8 페이지), 빠른 시작 매뉴얼 (8 페이지)

Follett Horizon Elite  HCC1410WVS 설치 지침 매뉴얼
Connect louvered docking assembly to ice machine.
• Plug must be accessible after final installation.
• H_E1410A/W 230/50/1) requires a 20 amp circuit (4.00 mm
Air-cooled ice machines – follow steps 7.1 through 7.5.
7.1
Ice transport tube
• Slide ice machine into louvered docking
assembly ensuring that drain tube is fully
seated on barbed drain fitting
• Insert ice transport tube all the way into
coupling and tighten nut firmly
7.3

Power cord

• Remove twist tie
• Carefully pass cord thru opening and plug
into wall outlet
• For H_E units, install a suitable plug
12
CAUTION
2

Internal connections

wire)
7.2
Potable water and drain lines
• Insert potable water line into valve
7.4
Power cord
• Position plate into opening and secure
with supplied screw
self-contained
VISION • RIDE Technology
7