Follett Horizon Elite Chewblet H C1010ABS Series 설치 지침 매뉴얼 - 페이지 7
{카테고리_이름} Follett Horizon Elite Chewblet H C1010ABS Series에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Follett Horizon Elite Chewblet H C1010ABS Series 16 페이지. Ice storage bin
Docking assembly
4
Install the docking assembly.
BEFORE PROCEEDING
Prior to installing the docking assembly, ensure that the drain fitting
is oriented (right or left) correctly for your installation. An optional
straight drain fitting is also supplied. You may need to remove the
back panel of the docking assembly in order to re-orient or change
the drain fitting. Replace back panel prior to mounting the docking
assembly.
Wall bracket accessory
Machine stand accessory
• Mount docking assembly to wall bracket
• Mount docking assembly to machine
accessory
stand accessory
BIN • RIDE Technology
self-contained
7