Follett Horizon Elite Chewblet HCD1410NVS 설치 지침 매뉴얼 - 페이지 6
{카테고리_이름} Follett Horizon Elite Chewblet HCD1410NVS에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Follett Horizon Elite Chewblet HCD1410NVS 17 페이지. Ice machine with ride technology
Follett Horizon Elite Chewblet HCD1410NVS에 대해서도 마찬가지입니다: 매뉴얼 (8 페이지), 매뉴얼 (8 페이지)
Prepare the dispenser.
2.1
3.1
Bin Signal Installation
• Mount the electrical box to the side of the Vision dispenser
Note: If a 4 x 4 box is mounted to a non-grounded surface, connect ground wire at an
appropriate ground.
• Connect the bin signal plug on the electrical box to the bin signal cord on the bin
• Insert 24" (70 cm) of the long bin signal cable
➍
and secure in place with strain relief provided.
• After sliding the ice machine module into the docking station, disconnect one wire from shuttle
switch and replace with wire from adapter plug.
• Connect wire removed from shuttle switch to male connector on adapter plug wire.
• Complete normal installation procedure for the ice machine using the installation manual that
shipped with the ice machine.
• Connect adapter plug into bin signal plug.
6
➎
➌
24"
(610 mm)
➌
into the hole in the back of the docking station
➎
➐
remote condensing
Dispenser preparation
➏
➐
➍
➊
to establish a ground connection.
VISION • RIDE Technology
3
➋
Ground
➊
➋
➏