Follett Horizon Elite HCD1810NJS 설치 지침 매뉴얼 - 페이지 13

{카테고리_이름} Follett Horizon Elite HCD1810NJS에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Follett Horizon Elite HCD1810NJS 17 페이지. Ice machine models with ride technology
Follett Horizon Elite HCD1810NJS에 대해서도 마찬가지입니다: 빠른 시작 매뉴얼 (8 페이지), 매뉴얼 (8 페이지)

Follett Horizon Elite HCD1810NJS 설치 지침 매뉴얼
Install front cover to ice machine.
8.1
Install condensing unit
• Complete installation of condensing unit
or connection to rack system.
• Required rack system capacity at 0 F
(-18 C) evaporator (EPR supplied by
installer).
1810N: 15,700 Btu/hr (3956 kcal/hr)
2110N: 18,200 Btu/hr (4586 kcal/hr)
Consult Operation and Service Manual provided with ice machine for sanitizing instructions.
DROP-IN • RIDE Technology
NOTICE
Ice machine MUST be sanitized prior to operation!
remote condensing
8.2
Install ice machine front cover
• Slide ice machine cover over machine
ensuring that tabs on back of cover
slip under louvers on back of docking
assembly
• Insert and tighten two screws through
cover and into docking assembly
8

Front cover

13