Prepare the bin.
3.1
Bin top preparation
C L
• Locate center of bin top
• Cut 3" (77,2mm) diameter hole in bin top
3.3
Bin top preparation
• Apply gaskets
• Install shuttle actuator
bin and secure with locking nut
6
3" ∅
(76,2mm)
C L
—
–
˜
–
through top of
self-contained
Bin preparation
3.2
Bin top preparation
• Remove protective tape from
gaskets

BEFORE PROCEEDING

Prior to installing the docking assembly,
ensure that the drain fitting is oriented (right
or left) correctly for your installation. An
optional straight drain fitting is also supplied.
You may need to remove the back panel of
the docking assembly in order to re-orient or
change the drain fitting. Replace back panel
prior to mounting the docking assembly.
BIN • RIDE Technology