Follett Maestro Plus MCD425ABS 설치 지침 매뉴얼 - 페이지 12
{카테고리_이름} Follett Maestro Plus MCD425ABS에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Follett Maestro Plus MCD425ABS 16 페이지. With ride technology
6.
Transport tube installation
Incorrect ice transport tube installation can result in wet ice and dispensing problems. Follow guidelines below
to ensure correct installation. Call factory for assistance if you are unable to meet these requirements.
6.1
General requirements
§ Maximum length of tube run – 20 ft (6 m). Factory approval required for longer runs.
§ Run tube without dips.
§ One continuous length of tube; no splices.
§ Minimum radius of bends in tube – 6" (15.3 cm) inside radius.
§ Maximum number of bends – 6.
§ Insulation on entire run of ice tube.
6.2
Procedure
1. Install supplied insulation on entire length of tube.
2. Remove ice machine top panel.
3. Select side, rear or top knockout in ice machine cabinet for tube entrance and install bushing.
4. Run insulated tube without dips between dispenser and ice machine and secure in place.
5. Slide end of transport tube and insulation through bushing and run to nozzle.
6. Cut tube to that length.
7. Pull insulation back and slip supplied hose clamp over end of transport tube.
8. Heat end of transport tube in cup of 160 F (71 C) hot water to soften
before making connection to ease assembly.
9. Push transport tube onto nozzle
10. Position clamp behind lip on nozzle and tighten clamp.
➊
Heat end of transport tube in cup of 160 F
(71 C) hot water to soften (1) and spread with
pliers before making connection (2).
12
➌
.
➋
Maestro Plus
➊
and spread with pliers
install insulation on full run of tube
➌
Evaporator
install clamp behind lip
on nozzle
Vision • RIDE Technology
➋
To dispenser
bushing