(2) Use suspension bolts for installation. Check whether
the ceiling is strong enough to support the weight of
the unit or not. If there is a risk, reinforce the ceiling
before installing the unit.
(Installation pitch is mentioned as follow. Refer to it to check
for points requiring reinforcing.)
4
PREPARATIONS BEFORE INSTALLATION
(1) Confirm the positional relationship between the unit
and suspension bolts. (Refer to Fig. 2)
Leave space for servicing the unit and include inspection
hatches. (Always open a hole on the side of the control box
so that the air filters, heat exchange elements, fans, and
humidifier elements can easily be inspected and serviced.)
1764
1688
(Suspension
bolt pitch)
Exhaust air to
outdoors (EA)
Fresh air from
outdoors (OA)
360(If the inspection
hatch is
450)
140(If the inspection
hatch is
600)
Model
VKM50GBMV1, VKM50GBV1
VKM80GBMV1, VKM80GBV1
VKM100GBMV1, VKM100GBV1
(2) Make sure the range of the unit's external static pres-
sure is not exceeded.
(See the fan-strength and static performance characteristic
drawings as well as the general catalog for the range of the
external static pressure setting.)
(3) Open the installation hole. (Pre-set ceilings)
• Once the installation hole is opened in the ceiling where
the unit is to be installed, pass refrigerant, drain piping,
transmission wiring, and remote controller wiring to the
unit's piping and wiring holes.
See "6 DRAIN PIPING AND SUPPLY WATER WORK",
"7 REFRIGERANT PIPING WORK", and
"10 WIRING EXAMPLE AND HOW TO SET THE
REMOTE CONTROLLER".
• After opening the ceiling hole, make sure ceiling is level if
needed. It might be necessary to reinforce the ceiling
frame to prevent shaking.
Consult an architect or carpenter for details.
(4) Install the suspension bolts.
(Use M10 to M12 suspension bolts.)
Use a hole-in-anchor, sunken insert, sunken anchor for
existing ceilings, or other part to be procured in the field to
reinforce the ceiling to bearing the weight of the unit.
(Refer to Fig. 3)
Indoor unit
Note: All the above parts are locally procured.
Fig. 3
3P130768-6L English
Unit (mm)
Return air from
room (RA)
Supply air to
room (SA)
Control box
Inspection hatches
Fig. 2
(mm)
A
B
832
878
1214
1262
Ceiling slab
Anchor bolt
Antivibration lifting
lug or turn buckle
Suspension bolt
5
THE METHOD OF INSTALLATION
CAUTION
<<Hold underside of the unit or hanger bracket without
putting force on other parts when unpacking or moving
the unit.>>
<<As for the parts to be used for installation work, be sure
to use the provided accessories and specified parts desig-
nated by our company.>>
(1) Install the unit temporarily.
• Attach the hanger bracket to the suspension bolt. Be sure
to fix it securely by using nuts (M10, M12) and washers
(M10 with external dia. 30 to 34 mm, M12 with external
dia. 36 to 38 mm) (locally procured) from the upper and
lower sides of the hanger bracket. (Refer to Fig. 4)
Hanger bracket
Duct layout precaution label
Transportation
anchors
Screw
(2) If unnecessary, remove the four transportation
anchors.
• Loosen the screws.
• Slide upward and remove the transportation anchors.
• Securely tighten the screws as before.
CAUTION
• The screws shouldn't be removed from the unit and should
be tightened in order to prevent air from escaping.
• Check that foreign objects such as plastic or paper are not
contained in the unit when installing.
• Install the unit after checking the indoor (SA/RA) and out-
door (EA/OA) in accordance with the figure duct layout
precaution label.
• Do not turn the unit upside down.
(3) Adjust the height of the unit.
(Tighten the double nuts securely.)
Nut
Washer
Double nut
Fig. 4
4