Bosch SGE63E15UC/01 설치 지침 매뉴얼 - 페이지 4

{카테고리_이름} Bosch SGE63E15UC/01에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Bosch SGE63E15UC/01 37 페이지.
Bosch SGE63E15UC/01에 대해서도 마찬가지입니다: 사용 설명서 (40 페이지), 설치 지침 매뉴얼 (37 페이지)

Bosch SGE63E15UC/01 설치 지침 매뉴얼
Hammer
Hole Saw
Pipe Wrench
Adjustable
Wrench
Tape Measure
Slot Screwdriver
Phillips Screwdriver
T-20 Screwdriver
Wire Cutter
Wire Stripper
Leve I
,, ,%,
Electrical
Supply Cable - Minimum
#14 AWG, 2 conduc-
tor, 1 ground,
insulated
copper
conductors
rated 75 C or
higher.
Hot Water Supply Line - Minimum
3/8" O.D. copper
tub-
ing or metal braided
dishwasher
supply line.
Shut-off
valve and fittings
appropriate
for hot water sup-
ply line (copper
tubing/compression
fitting,
or braided
hose).
UL listed conduit
connector
or strain relief is required
if
you attach the field wiring
directly
to the terminal
block.
4