Dragonfly DF-SL-100-ALR 설치 매뉴얼 - 페이지 2
{카테고리_이름} Dragonfly DF-SL-100-ALR에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dragonfly DF-SL-100-ALR 2 페이지. Ambient light rejecting fixed projection screens
ALR Fixed Screen Installation Manual
Dragonfly Fixed Screen Assembly Instructions
Step 1. Unpack the Screen
I.
Lay out all the parts on a clean, flat surface.
J. To avoid stains or damage, do not unpack the screen material at this time.
Package Contents
Screen Frame
Upper Wall
(2 short, 2 long)
Mounting Bracket (2)
5x40mm Phillips
Concrete
Head Screws (8)
Anchors (8)
L-Bracket
Spring Tool (2)
Screws (16)
Step 2. Assemble the Frame
A carpenter's square is very helpful for this step.
A. Place all of the frame tubes face down on a flat, clean work surface and line up the ends to form the shape
of the finished screen.
B. Insert the brackets into the frame ends as shown, then fully assemble the frame, Secure each corner with
four screws.
C. Work around the frame several times, using the square to align the frame corners and tightening the
screws a little each time.
L-Bracket
Top Frame
Side Frame
Lower Wall
Screen Material (1)
Mounting Bracket (2)
Screen Retaining
L Bracket
Springs
Assembly (4)
Installation
Protective Pad
Gloves (2 pr)
for Assembly (1)
© 2017 Dragonfly
Step 3. Put on Installation Gloves
*The included installation gloves MUST be worn by the installers handling the screen material.
Step 4. Attach the Screen Material
A. Clean the work area to avoid staining the screen material. Begin with the assembled frame laying face-
down on a protective pad or a clean, soft surface. Remember to wear the installation gloves while handling
the material!
B. Unpack the screen material and lay it centered in the frame, then gather the spring tools and springs.
Place four longer springs at each corner of the frame. Installation notes:
• The springs should be hooked into the outermost channel in the back of the frame using the tool as
illustrated.
• On the spring, the large hook attaches to the screen material. The small hook attaches to the frame.
• Hook the spring on the screen material, then to the frame.
C. Using the spring tools, attach the four springs in each corner first, then work toward the center of each
side.
1
Spring Installation
2
Size
Top
Bottom
92"
12
100"
13
110"
14
120"
16
170314-1538
ALR Fixed Screen Installation Manual
Spring Quantity
Left
Right
Total
12
7
7
38
13
8
8
42
14
8
8
44
16
9
9
50
4
3