1 Determine which side requires adjustment.
2 Secure dowel with one hand.
Caution: Do not touch or bend surface.
3 Using Phillips-head screwdriver, depress spring-loaded adjustment
screw (see drawing) and slowly turn clockwise to tighten tension, or
counterclockwise to loosen tension. The screw adjusts in ¼ turn
increments. Adjust only one increment (¼ turn).
4 If problem is not corrected, leave screen in position for 24 hours to allow
surface material to stretch into position.
5 If problem still is not corrected, repeat steps 2 and 3.
229 mm
191 mm
254
mm
243
mm
203 mm
173
mm
121
mm
243
mm
Tab-Tension Adjustment Procedure for Ultimate Access/Series V
Mounting brackets slide
left and right as needed.
25
mm
16
mm
L*
Series E
Viewing Surface
Ceiling tile
(by others)
Series E
*L =
208 mm
Alternative mounting configuration
www.draperinc.com
Dowel
Case Dimensions
Series V
Varies
(765) 987-7999
Tensioning
Cable
Adjustment
Screw
Series V
Viewing Surface
Page 3 of 4