BCS 921ML002 운영자 매뉴얼 - 페이지 5

{카테고리_이름} BCS 921ML002에 대한 운영자 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. BCS 921ML002 6 페이지. Plastic mulch layer

4
Drip Tape Layer Kit Installation
The Drip Tape Layer (DTL) Kit is sold separately from the PML
and consists of two pieces that are installed on the front and
rear of the implement. The Shovel is installed on the front of
the implement and the Spool Holder is installed on the rear.
The Shovel can be installed anywhere on the front (tractor)
end of the PML. Usually, it is desirable to have it centered,
or as close to the center as possible, and the Mounting
Flange was designed with enough clearance for this
purpose.
Shovel mounted in center, directly behind
Mounting Flange.
Spool Holder mounted with Drip Tape fed over the Mulch Roll and into the Shovel.
1-800-543-1040
Shovel (left) and Spool Holder (right).
Install the Drip Tape spool between the collars of
the Spool Holder. To prevent the Drip Tape from
unspooling, make sure the Spring is installed
outside of the collars. If the Drip Tape spool still
spins freely, compress the Spring further.
bcsamerica.com
4