Bosch Benchmark HBLP451LUC 설치 매뉴얼 - 페이지 11
{카테고리_이름} Bosch Benchmark HBLP451LUC에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Bosch Benchmark HBLP451LUC 39 페이지. Built-in wall ovens
Bosch Benchmark HBLP451LUC에 대해서도 마찬가지입니다: 사양 (3 페이지), 설치 매뉴얼 (22 페이지), 서비스 매뉴얼 (45 페이지)
Installing the Oven into the Cabinet (all
ovens)
1.
The unit and its bottom packaging (wood and
styrofoam base) should be positioned close to and in
front of the cabinet opening prior to beginning to lift the
unit into place.
2.
Lift or slide unit into the cabinet cutout without allowing
the unit base to contact the flooring.
3.
Check that the conduit cable does not fall behind the
unit during installation. It may help to run the conduit
into the area it will be connected to (such as an
overhead or adjacent cabinet) and tape the end down
so it doesn't fall out while the unit is being slid into
place.
4.
Guide the unit straight back into the cabinet cutout.
Note: Be careful not to crimp the flexible conduit
between the oven and the cabinet back wall. If
necessary, guide the flexible conduit into the wall or
cabinet access hole so it doesn't prevent the unit from
being pushed all the way into the cabinet opening. The
oven should be straight and level, not crooked.
5.
Push the unit straight in until the oven trim is flush with
the front of the cabinet trim.
6.
Install supplied screws through tap holes in trim.
(2 screws for single ovens, 4 screws for double ovens).
9001065629 Rev A
English 9