Electrolux 300 Series 사용 및 관리 매뉴얼 - 페이지 16
{카테고리_이름} Electrolux 300 Series에 대한 사용 및 관리 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Electrolux 300 Series 46 페이지. Front load dryer
Electrolux 300 Series에 대해서도 마찬가지입니다: 소유자 매뉴얼 (11 페이지), 사용 및 관리 매뉴얼 (39 페이지), 설치 지침 매뉴얼 (50 페이지), 사용 및 관리 매뉴얼 (28 페이지)
16 Pre-Installation Requirements
Dryer dimensions
53.5" (136 cm)*
to clear open door
freestand dryer
dryer mounted on
optional pedestal
approved stacking
kit (STACKIT7X)
required for
stacked installation
* Connection of water inlet hose on steam dryer adds 3/4 in. (2 cm) to installation depth.
Power supply cord length on gas dryer or electric Canadian dryer approximately 60
1
inches (152.5 cm).
Drain hose length on washer approximately 59 inches (150 cm).
2
Power supply cord length on washer approximately 60 inches (152.5 cm).
3
32" (81.25 cm)*
to front of closed door
on floor
floor line
floor line
53.5" (136 cm)*
to clear open door
32.0" (81.25 cm)*
to front of closed door
floor line
38.0"
(96.5 cm)
1.5"
(4 cm)
53.25"
(135.5 cm)
gas supply
pipe on rear
of gas unit
17.0"
(43 cm)
3.75"
(9.5 cm)
75.75"
(192.5 cm)
water supply
connection on
rear of unit
gas supply
pipe on rear
of gas unit
drain hose on
39.0"
rear of unit
(99 cm)
27.0"
(68.5 cm)
electrical
supply on
rear of unit
1
3.7"
(9.5
centerline
height of
rear vent
19.0"
13.5"
(48 cm)
(34.5 cm)
to center of
rear vent
electrical
supply on
rear of unit
1
centerline
height for
rear vent
power cord on
rear of unit
3
2
41.0"
(105 cm)