Electrolux C260 운영 및 설치 매뉴얼 - 페이지 11

{카테고리_이름} Electrolux C260에 대한 운영 및 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Electrolux C260 20 페이지. Hydro-extractor
Electrolux C260에 대해서도 마찬가지입니다: 운영 매뉴얼 (24 페이지), 서비스 매뉴얼 (41 페이지)

Electrolux C260 운영 및 설치 매뉴얼
Installation of all types of hydro-extractor

Concreting, procedure:

• Cut out the floor approx. 75 mm down. Make
1
sure that the sides of the hole have an
outwards slope; the lower longitudinal
dimension L must be 120 mm bigger than the
dimension at the edge of the floor. Build up a
casting mould, see fig. 1.
• Water the hole thoroughly and apply cement
plaster to the bottom and sides of the hole.
• Concrete the foundation. Foundation bolts can
be concreted into the foundation. Use the
template that comes with the machine to
position the bolts. Make sure that the surface is
entirely horizontal.
• Allow the new concrete to dry for at least 48
hours before placing the hydro-extractor on it.
Fit the hydro-extractor as described on the
following pages.
487 22 52 21 - Cent. 240, 260, 290, GB
Installation
1
100
75
;;;;;
L
;;;;;
L + 120 mm
11