Dražice OKC 200 NTRR / BP 작동 및 설치 매뉴얼 - 페이지 9

{카테고리_이름} Dražice OKC 200 NTRR / BP에 대한 작동 및 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dražice OKC 200 NTRR / BP 20 페이지. Stationary water heaters
Dražice OKC 200 NTRR / BP에 대해서도 마찬가지입니다: 작동 및 설치 매뉴얼 (17 페이지), 작동 및 설치 매뉴얼 (12 페이지), 작동 및 설치 매뉴얼 (19 페이지), 작동 및 설치 매뉴얼 (20 페이지), 작동 및 설치 매뉴얼 (18 페이지), 운영 및 설치 매뉴얼 (20 페이지), 작동 및 설치 매뉴얼 (18 페이지), 운영 및 설치 매뉴얼 (13 페이지)

Dražice OKC 200 NTRR / BP 작동 및 설치 매뉴얼

2 OPERATION AND FITTING INSTRUCTIONS

2.1 OPERATING CONDITIONS

The tank shall only be used in accordance with the conditions specified on the performance
plate and in instructions for electric wiring.
regulations and standards, also conditions for connection defined in local electric and water
works have to be adhered to, as well as the installation and operation manual. The room, in
which the appliance will be operated, must be frost-free. The appliance has to be mounted
at a convenient place, it means that the appliance must be easily available for potential
necessary maintenance, repair or replacement, as the case may be.
We would like to emphasise that the appliance must not be connected to power supply if
work involving flammable liquids (petrol, spot remover) or gases, etc., is performed
nearby.
If water is strongly calcareous we recommend that any of the common decalcifying devices
was installed with the appliance, or the thermostat to be set to minimum operation
temperature of 60
used. To avoid potential sediments we recommend that the device was installed together
with a water filter.

2.2 WALL MOUNTING

Prior to mounting, check the loading capacity of the wall and, depending on the type of
masonry, choose a suitable anchorage material, or reinforce the wall, if needed. The
appliance shall only be mounted in vertical position so that the lower side of the appliance
was placed at least 600 mm above the floor (Figure 1). In appliances, elbows have to be
attached to the heating water inlet and outlet and, by turning them, the mounting either
from the right or from the left has to be determined (Figure 4). With regard to various types
of carrying masonry and broad assortment of special anchorage material available at the
market, we do not provide appliances with this material. The anchorage system has to be
selected individually, depending on the conditions. We recommend an authorised company
perform mounting on the wall and anchorage, or discuss the anchorage with a professional.
o
C. For proper operation, drinkable water of adequate quality shall be
Besides legally acknowledged national
- 9 -