Drazice OKCV 180 작동 및 설치 매뉴얼 - 페이지 10
{카테고리_이름} Drazice OKCV 180에 대한 작동 및 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Drazice OKCV 180 19 페이지. Tank-type water heaters for
horizontal mounting
Drazice OKCV 180에 대해서도 마찬가지입니다: 작동 및 설치 매뉴얼 (13 페이지)
2.3 PLUMBING FIXTURE
For potential disconnection of the heater, the service water inlets and outlets must be
provided with screw coupling Js 3/4".The safety valve is mounted on the cold water inlet
identified with a blue ring.
Each hot service water pressure heater must have a safety valve with membrane spring.
Nominal clearance of safety valves is defined by standard. Heaters are not equipped with a
safety valve. The safety valve must be easily accessible, as close to the heater as possible.
The inlet pipes must have at least the same clearance as the safety valve. The safety valve is
placed high enough to secure dripping water drain by gravity. We recommend mounting the
safety valve onto a branch pipe. This allows easier exchange without having to drain the
water from the heater. Safety valves with fixed pressure settings from the manufacturer are
used for the assembly. Starting pressure of a safety valve must be identical to the maximum
allowed heater pressure and at least 20 % higher than the maximum pressure in the water
main (Table 5). If the water main pressure exceeds such value, a reduction valve must be
added to the system. No stop valves can be put between the heater and the safety valve.
During the assembly, follow the guide provided by the safety equipment manufacturer.
Obrázek 3
- 10 -