Drazice OKC 200 NTR 작동 및 설치 매뉴얼 - 페이지 7

{카테고리_이름} Drazice OKC 200 NTR에 대한 작동 및 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Drazice OKC 200 NTR 17 페이지. Stationary water heaters
Drazice OKC 200 NTR에 대해서도 마찬가지입니다: 운영 및 설치 매뉴얼 (13 페이지)

Drazice OKC 200 NTR 작동 및 설치 매뉴얼
7.

CONNECTION OF INDIRECT HEATER TO HOT WATER HEATING SYSTEM

(Fig. Examples of connection... and Fig. 1)
It is recommended to install stop valves on the heating water inlet and outlet (for possible dismantling of the heater). The
valves have to be as close to the heater as possible to avoid higher thermal losses.
The heating circuit is connected to marked inputs and outputs of the heater exchanger; the deaerating valve is mounted in
the highest place. It is necessary to install a filter into the circuit in order to protect the pumps, the three-way valve, and
backflow flaps, and the exchanger from sedimentation. It is recommended to flush the heating circuit before the assembly.
All wiring connections must be properly insulated from heat.
If the system works with priority heating of HSW using a three-way valve, always follow the installation instructions of
the three-way valve's manufacturer.
7