Drazice OKC 300 NTRR/SOL 운영 및 설치 매뉴얼 - 페이지 11

{카테고리_이름} Drazice OKC 300 NTRR/SOL에 대한 운영 및 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Drazice OKC 300 NTRR/SOL 17 페이지. For solar systems
Drazice OKC 300 NTRR/SOL에 대해서도 마찬가지입니다: 작동 및 설치 매뉴얼 (12 페이지)

Drazice OKC 300 NTRR/SOL 운영 및 설치 매뉴얼

2.2.2 EXAMPLE OF CONNECTING A TANK WITH SOLAR COLLECTORS AND A GAS BOILER

Connecting a tank to a boiler heating circuit:
The tank is placed on the ground, next to the heating source, or in its vicinity. The heating circuit is connected
to marked inlets and outlets of the tank's heater exchanger; deaeration valve is mounted in the highest place.
It is necessary to install a filter into the circuit in order to protect pumps, three-way valve, backflow flaps and
the exchanger from sedimentation. It is recommended to flush the heating circuit before the assembly.
All wiring connections must be properly insulated from heat.
If the system works with priority heating of HUW using a three-way valve, always follow the installation
instructions of the three-way valve's manufacturer.
Figure 3
The output hot water pipe on heaters with a volume of more than 200 litres is fitted with another DN 20
safety valve and opening pressure identical to the maximum operating pressure of the heater tank. This
safety valve does not replace the safety valve on the cold water inlet. No shut-off valve, non-return valve or
filter may be placed between the safety valve and the heater.
- 11 -