Drazice LX 50 운영 및 설치 매뉴얼 - 페이지 11
{카테고리_이름} Drazice LX 50에 대한 운영 및 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Drazice LX 50 19 페이지. Solar hybrid air-conditioning unit
Before filling, the connecting pipes between the indoor and the outdoor unit must be
drained with a vacuum pump!
OPERATING CHARACTERISTICS OF LX AIR
CONDITIONER
5.1 TEMPERATURE RANGE OF LX AIR CONDITIONER
Temperatures
Room temperature
OUTSIDE TEMPERATURE
If the outdoor temperature is below 0 °C, the start of the air-conditioning unit can
be delayed for several minutes after switching on.
5.2
CONNECTING THE AIR-CONDITIONING UNIT TO THE 1-2,3 Kw LXDC
CONTROL BOX
To achieve the maximum year-round use of the (DC) electricity produced by the solar panels, it is
advisable to connect the LX outdoor air-conditioning unit to the 1,2,3 kW LXDC BOX control unit.
They connect via:
A.
DC cables (diameter 4-6 mm) with MC4 connectors on both ends of the DC cables with connection
to outlet no. 2 on the 1-2,3 kW LXDC BOX control unit
B.
Two-core cable (twin cable) which connects the LX outdoor air-conditioning unit with the 1,2,3
kW 12V AC LXDC BOX control unit.
Cooling mode
17°C – 31°C
0°C – 50°C
Outlet no. 2 (DC-MC4) on 1-2,3 kW LXDC BOX control unit to the LX
outdoor air-conditioning unit
MC4 (+)
MC4 (-)
Heating mode
0°C – 30°C
-15°C – 30°C
- 11 -