Anchor Venue Series 설치 지침 매뉴얼 - 페이지 6

{카테고리_이름} Anchor Venue Series에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Anchor Venue Series 8 페이지. Structures
Anchor Venue Series에 대해서도 마찬가지입니다: 설치 지침 매뉴얼 (7 페이지)

Pull Rope
Eave Cable
Liner being raised.
Step 8
At eave line, hook liner eave hooks to eave cable as shown
in Figure 8. After all hooks are connected, raise liner to
fi nal position and tie off as shown in Figure 7b.
Eave beam
Eave cable
6
Step 7
With one person holding each rope, pull the
liner up in unison until the ridge tubes are
above the eave line. Tie ropes off to bottom of
Figure 6c
upright as shown in Figure 7b.
Figure 7a
View looking up at eave.
Figure 7b
Figure 8