1st-Relief 1st23VCTILTRIBW 매뉴얼 - 페이지 9

{카테고리_이름} 1st-Relief 1st23VCTILTRIBW에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. 1st-Relief 1st23VCTILTRIBW 11 페이지. Tilting davits

Manual
4.2

Using your tilting Davit

4.2.1 Attach davits to threaded deck plates

Attach davits to threaded deck plates using the bolts, split washers, using your tilting Davit
Short bolt

4.2.2 Tighten

Tighten using a socket.

4.2.3 Remove lynch

Remove the lynch pin (or lock ring) then the hitch pin from each davit.
FN:
552603b (LG f. ZRS Graz)
VAT No.:
ATU76757859
Figure 10 Attach Davit
Figure 11 Tighten Davit
Figure 12 Remove lynch
page 9 of 11
Bank:
RB Graz-Mariatrost
Swift/BIC:
RZSTAT2G223
IBAN:
AT08 3837 7000 0420 9185
Long bolt
Handbuch VC Tilting Davits EN 1_3.docx
1st-Relief GmbH
Schulgasse 5
8010 Graz, Austria