CommScope 360-iP-PMAX-GS5-48 지침서 - 페이지 6
{카테고리_이름} CommScope 360-iP-PMAX-GS5-48에 대한 지침서을 온라인으로 검색하거나 PDF를 다운로드하세요. CommScope 360-iP-PMAX-GS5-48 6 페이지. Modular panel

Installing the Patch Cord Management
and Front Bezel
To complete the installation of the SYSTIMAX 360
®
PATCHMAX
Modular Panel, install the patch cord management
and bezel on the front of the panel.
To install the patch cord management and front bezel:
1 Align the patch cord management as shown in Figure 14 and
slide it onto the mounting arms until fully seated.
Figure 14 Installing the Patch Cord Management
2 Position the front bezel at an angle as shown in Figure 15 and
insert the 2 bottom retention tabs into the slots on the patch cord
management.
3 Pivot the top of the bezel towards the panel until the 3 tabs on
the top of the bezel snap into the panel (Figure 15).
Figure 15 Installing the Front Bezel
4 Restore power to the rack's Panel Manager.
© 2010 CommScope, Inc. All rights reserved.
Instruction Sheet: SYSTIMAX 360™ iPatch
How To Contact Us
To find out more about SYSTIMAX
www.commscope.com/systimax
™
®
iPatch
For technical assistance regarding SYSTIMAX products:
Within the United States, contact your local account
representative or CommScope Technical Support at
1-800-344-0223.
From outside the United States, contact your local account
representative or Authorized BusinessPartner.
6
®
®
PATCHMAX
Modular Panel
®
Solutions, visit us on the web at