CommScope 460143027 해지 지침 - 페이지 6
{카테고리_이름} CommScope 460143027에 대한 해지 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. CommScope 460143027 13 페이지.

860532050
Instruction Sheet
Table 1 can be used as a guide to the orientation of the ribbonized cable when being spliced onto the QWIK
MPO ferrule in the splicer:
Cable
Type
Standard
Trunks
Equipment
Cords
Table 1
Equipment cords (EQ) use female ferrules.
Step 3 – Strip and Clean the Fiber
1.
Spring
Protection
sleeve
1. After removing the ribbonized fiber from the ribbon tool, slide the spring and the protection sleeve from
connector kit onto ribbonized fiber as shown.
Important: Verify correct orientation of the protection sleeve with steel bar on the bottom.
2. Place the fiber cable into the fiberclip holder with .78 –1.18 in (20-30mm) of the ribbonized fiber protruding
as shown.
Page 6 of 13
Gender
Blue Fiber Position
(when placed in splicer)
End A/B
End A
Male/Male
Bottom
Female/Male
Top
Female/Female
Top
EQ-Female
Bottom
EQ-Male
Bottom
EQ-EQ
Bottom
Ribbonized
fiber
2.
End A
Ch
End B Ch
1
Top
12
Top
1
12
Bottom
1
12
1
12
Bottom
Top
1
12
Top
1
12
Line represents the #1 (blue) fiber in a ribbonized cable
Ferrule window up
Female ferrule
www.commscope.com
End B
Ferrule window down
Male ferrule