CommScope 760230946 지침서 - 페이지 7
{카테고리_이름} CommScope 760230946에 대한 지침서을 온라인으로 검색하거나 PDF를 다운로드하세요. CommScope 760230946 9 페이지. Powered fiber cable transition box

860660202
Rev. B
Instruction Sheet
4. Terminate the LC Fiber Optic plugs per product specifications instructions. Visit
www.commscope.com
Note: Furcation tubing can be used to protect coated fiber.
Visit
www.commscope.com
5. Clean and install the LC terminations into the adapter; see installation and cleaning
instructions:
6. Repeat steps 1 – 5 for all outgoing PFCs.
Figure 9
for LC Connector application, instructions, and tool kit information.
TECP-96-194.
Store excess fiber slack on the spool, as shown in Figure 11.
Figure 11
© 2021 CommScope, Inc. All Rights Reserved
for a variety of colors.
Figure 10
www.commscope.com
Page 7 of 9