1st-Relief VERSACHOCK 매뉴얼 - 페이지 8

{카테고리_이름} 1st-Relief VERSACHOCK에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. 1st-Relief VERSACHOCK 11 페이지. Winch kit
1st-Relief VERSACHOCK에 대해서도 마찬가지입니다: 매뉴얼 (10 페이지)

Manual
3.5

Installation Sequence

Basic Steps for Tilting Davit Installation:
1. Measure total length of dinghy and outboard combined.
2. Locate the dinghy side to side centring on platform (be sure the outboard does not
overhang the platform)
3. Locate the aft davit/deck plates by following the dimensions shown.
4. Locate the fore davit/deck plates by following the dimensions shown.
5. Complete the deck plate installation to the platform by drilling a hole (slightly larger than
deck plate base) at the centre of each deck plate location shown below then attach using
#10 through bolts/backing plates or washers.
4

Tips for the operation of the tilting Davit

4.1

Get Familiar with your Davit

,
Upper davit arm
(tilts)
Lower davit arm
(fixed)
Hitch Pin/lock,
ring/lynch pin
Figure 9 Hitch Pin/lock
FN:
552603b (LG f. ZRS Graz)
VAT No.:
ATU76757859
Figure 8 Davit Parts
page 8 of 11
Bank:
RB Graz-Mariatrost
Swift/BIC:
RZSTAT2G223
IBAN:
AT08 3837 7000 0420 9185
Adjustable Bunks
(RIB model only)
Threaded Deck
Plates
Bolts/Split
Washers/Flat
Washers
Handbuch VC Tilting Davits EN 1_2.docx
1st-Relief GmbH
Schulgasse 5
8010 Graz, Austria