Carmanah R247-F 설치 매뉴얼 - 페이지 6
{카테고리_이름} Carmanah R247-F에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Carmanah R247-F 20 페이지. Traffic beacon
Carmanah R247-F에 대해서도 마찬가지입니다: 빠른 시작 매뉴얼 (20 페이지), 에너지 관리 시스템 교체 매뉴얼 (12 페이지), 설치 매뉴얼 (20 페이지)
1
Ensure all metal chips are removed
to prevent system damage caused
by short circuits.
Ensure that no burrs are present
that would interfere with the
antenna seal.
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | [email protected] | carmanah.com
Drill Hole for Antenna
• Use the indentation to locate the tip of the drill bit.
• Drill a ½" hole on top of the enclosure.
• Deburr hole and remove all aluminum chips.
APPLIED INFORMATION (AI) INTEGRATION INSTALL GUIDE
Ensure equipment is not powered
during installation and wiring of
the system. Recheck all completed
wiring for proper polarity prior to
energizing the system.
F Series
Page 6