CommScope FACT-FRACCFOPL 설치 지침 - 페이지 7

{카테고리_이름} CommScope FACT-FRACCFOPL에 대한 설치 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. CommScope FACT-FRACCFOPL 8 페이지. Fanout fixation kit

CommScope FACT-FRACCFOPL 설치 지침
6. Routing Fanouts - Step 4
Step 4:
Route the cables as illustrated.
The fanouts that are terminated on the top
fanout plate should be routed to the top 28
Fact elements.
The fanouts that are terminated on the bottom
fanout plate should be routed to the bottom
28 Fact elements.
Repeat the process for all the fanouts that
have to be installed.
Page 7 of 8
© 2019 CommScope, Inc. All Rights Reserved