ATI Technologies 39-0050 설치 및 운영 매뉴얼 - 페이지 2

{카테고리_이름} ATI Technologies 39-0050에 대한 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. ATI Technologies 39-0050 19 페이지. Digital control installation & operation

ATI Technologies 39-0050 설치 및 운영 매뉴얼
GOOD PRACTICE: Mains Supply.
A separate mains supply and earth running directly from the consumer meter is essential.
Avoid routing the mains cable to the power supply close to other supplies especially those providing intermittent
current- motors that are starting and stopping continually or high power heaters with thermostatic control.
Terminate in a sealed, fused, double pole switched outlet fitted with a 13Amp (Type 1362) fuse or trip. A 3-pin ring
main socket is not suitable in parlour conditions. All mains cabling must be contained in a firmly secured durable conduit.
Power Supply: Siting.
Fix the power supply to a wall or suitable brackets in a well ventilated area sufficiently high to avoid physical contact
or damage, leaving a gap of at least 250mm (10") between the top of the power supply casing and the ceiling.
Position the power supply so that the output (low DC voltage) cables are as short as possible even if this means
extending the mains supply.
ATL Power Supply: Output Voltages.
ATL power supply outputs are factory set and should not be adjusted. For a 230volt mains supply the DC outputs
should be:
Feeder Supply with 4 feeders running: 13.6volts.
The feeder supply is fused at either 20 or 30Amps depending upon the type. Additionally, there is a thermal cutout
associated with the feeder supply which will remove power from the feeders in the event of an overload. It may take several
minutes for the supply to be restored if the cutout does operate.
There are two indicators fitted to the base of the power supply casing; red indicates that the mains is present and
green that the regulated feeder supply is available.
Control and Feeder Cables and Conduit.
Cables must be kept as short as possible running directly from point to point. Cut out any excess cable rather than
leaving it coiled.
Wherever possible cables should be contained in a waterproof conduit using
diagrams.
Entries must be made into the bottom of power supply or control casings but never into the top. This will invalidate the
warranty.
Strip existing cables back to bright copper before connection.
Keep multicore cables away from other cables especially those carrying mains or heavy currents. Cross only at 90
where necessary and do not enclose in conduit with other cables.
the correct csa cable specified in the
o
DIGITAL CONTROL
INSTALLATION
& OPERATION: INDEX
INDEX
Good Practice:
Installation:
Vacuum Operated Feeders:
Feeder Calibration Slides:
Special Feeder Connections:
The Global Timing Pulse:
Single Feeder Connections:
Double Feeder Connections:
12volt Single Feeder: Herringbone Parlour Connections 5
12volt Double Feeder: Herringbone Parlour Connections 6
12volt Double Feeder: Abreast Parlour Connections:
12volt Feeder Connections using existing 12volt
12volt Feeder Connections using ATL Digital Power
Feeder Connections using ATL Control Only Power
Supply with Global Timing Pulse:
Data Sheets Included:
Datasheet 08A - Mechanical-Electronic Conversion
Datasheet 08B - Feeder Interface
Datasheet 08C - 24volt AC Interface
Datasheet 08D - Control Only PSU - Westfailia Feeders
Datasheet 23A - Wesfalia Resistor Fitted
Datasheet 23B - Westfalia Resister NOT Fitted
Index
1
2
2
3
3
3
3
4
4
7
8
9
10
11