Andersen A2 설치 매뉴얼 - 페이지 4

{카테고리_이름} Andersen A2에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Andersen A2 6 페이지.
Andersen A2에 대해서도 마찬가지입니다: 매뉴얼 (16 페이지)

Andersen A2 설치 매뉴얼
Basic Solar Charging
Smart Energy Management
Grid CT Clamp Sensor
This is installed around the live mains input supply, close to the domestic energy
meter (Fig:1).
A twisted pair shielded signal cable should be used to connect the CT clamp to the
Andersen chargepoint (Fig:2). The cable length between the CT clamp and
chargepoint should not exceed 30 meters.
This can be purchased from Andersen EV.
This CT clamp is specifically calibrated for use with the A2 unit.
No other CT clamp model is supported for the adaptive fuse feature
Please ensure the CT Clamp is installed the correct way round i.e. not recording
negative kW.
Should you see a negative reading confirm this is solar surplus (export) by
turning off the solar and following the test procedure.
Andersen EV Solar Charge
Installation Guide
ANDERSEN
AEV-SC-05052020-IST 1.1-UK