Anderson PBA90 운영 매뉴얼 - 페이지 6
{카테고리_이름} Anderson PBA90에 대한 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Anderson PBA90 7 페이지.
8.
Appendix
8.1 Training Record
Each trained person must verify that he has read and understood the contents of the operating
manual and know how to operate and maintain this series of burners correctly.
Manual Number and
Revision
8.2 Bi-annual Audit Record
Routine audit must be made every 6 months. Please sign the following table.
Function Audit
Flame sensor state
air and gas pressure
Alarm signals
igniter electrode
Control motors
Ventilate equipment
Interlock Function
Shut off cock function
Combustion air blower
Anderson Thermal Soluions(Suzhou)Co., Ltd
Date
Date
Inspector
Anderson Thermal Solutions – PBA90 Operation Manual
Who (Name)
Problem description
4
Signature
Next Audit Time