ATIM ACW-LW8 설치 매뉴얼 - 페이지 2

{카테고리_이름} ATIM ACW-LW8에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. ATIM ACW-LW8 10 페이지. Atim cloud wireless - metering 2 digital inputs – 1 wirecut input

2.
POWER INTERRUPT MAGNET
'TILT'
3.

INSTALLATION

You must open the casing in order to
gain access to module's configuration
switches and to the terminal blocks. To
do this, insert a screwdriver into the slot
and tilt it downward to lift the inside tab
(see photo opposite). Then pull on the
back panel to separate the two parts of
the casing.
For optimal results, it is recommended
that you install the modem away from
all environmental obstructions, at least
2m above the ground and not right
against a wall — ideally at least 20cm
away. The cables must be no longer
than 10m and must be shielded.
Note that the antenna is integrated into
the casing.
The casing can be mounted on a flat
wall or on a tube, depending on the
installation type you prefer.
ACW-MR2_QIG_FR_V2.5
You can cut power to the device by placing a
magnet on the right side. A keep-alive frame and a
test frame are transmitted automatically when the
device starts up, allowing you to verify the
installation on-site. Because the product consumes
very little power in stand-by mode, you may have to
leave the magnet in place for 30 seconds to ensure
that the device restarts correctly.
- Complete technical manual available at www.atim.com -
2 m
2