Comnet CNGE3FE8MSPOE 빠른 시작 매뉴얼 - 페이지 6

{카테고리_이름} Comnet CNGE3FE8MSPOE에 대한 빠른 시작 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Comnet CNGE3FE8MSPOE 10 페이지. Environmentally hardened managed ethernet switch 3 ge sfp + 8 fe electrical ports with optional 30 or 60 watt poe
Comnet CNGE3FE8MSPOE에 대해서도 마찬가지입니다: 빠른 시작 매뉴얼 (12 페이지)

Comnet CNGE3FE8MSPOE 빠른 시작 매뉴얼
QUICK START GUIDE

Wall Mounting Installation

Each switch has another installation method for users to fix the switch. A wall mount panel can be
found in the package. The following steps show how to mount the switch on the wall:
Mounting the CNGE3FE8MS on a Wall
Step 1: Remove DIN-Rail kit if it is installed.
Step 2: Remove the two screws at the top of the unit's back panel. Remove only one pair of back
panel screws at time (these hold the back panel in place on the unit).
Step 3: Use the same two screws plus one of the included screws to attach the wall mount panel to
the top set of screw holes as shown in the diagram below.
Step 4: Repeat Steps 2 and 3 to mount the second wall mount panel on the bottom of the unit's
back panel.
ATTENTION: Do not remove the top and bottom panel screws at the same time, or the back
panel will detach from the unit. Install the wall mount panels one at a time.
In order to prevent switches from being damaged, the screws should match the size screws that
comes pre-installed in the CNGE3FE8MS switch (M3 × 8 mm).
TECH SUPPORT: 1.888.678.9427
CNGE3FE8MS[POE][HO]
QSG_CNGEFE8MS[POE][HO]_REV– Rev. 2.3.17 PAGE 6