Comnet U) Series 설치 및 운영 매뉴얼 - 페이지 9

{카테고리_이름} Comnet U) Series에 대한 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Comnet U) Series 10 페이지. 10/100 4tx+1ex ethernet self-managed switch with power over ethernet (poe+)

Comnet U) Series 설치 및 운영 매뉴얼
INSTALLATION AND OPERATION MANUAL
ATTACHING THE FERRITE CORE TO THE POWER CORD OF THE UNIT
When using v48VDC Power Supplies
Attaching the ferrite core to the power cord of the unit helps
prevent RF interference from radio signals.
1. Pull the fixing tab of the ferrite core to open it.
2. Make three loops around the core with the power cable of
the unit.
3. Attach the ferrite core to the unit power cord as shown and
press it until it clicks.
Recommended part is Wurth Part 742 711 32 S
(Not included). Equivalent parts may be substituted.
LOOPING THE POWER CABLE AROUND THE FERRITE CORE
Lift up to release the lock and open the core.
Make three loops around the core with the power cable.
Start winding 5 to 10 cm (2 to 3.9 in) away from the power
connection.
Close the lock. You may now operate the unit according to
instructions.
TECH SUPPORT: 1.888.678.9427
CLFE4+1SMS[POE](C,U) SERIES
(Ferrite core not included, must be purchased separately)
Closed
INS_CLFE4+1SMS[POE](C,U)_REV– 10/27/11 PAGE 9
Open